Show project information

Brink's

In this project, we wanted to make sure that the renovation and refurbishment of three floors of an existing office building was as flexible, sustainable, and comfortable as possible. Open space workplaces and closed meeting rooms alternate. Concentration areas and direction offices provide comfort and flexibility. We use acoustic plaster on the structural ceiling and leave technics visible to maintain maximum ceiling height and as such enhance spaciousness.

Address: Dilbeek
Client: Brink's Solutions Belgium
Programme: Interior renovation and refurbishment of the ground floor, 1st and 2nd floor of an existing office building.
Area: +/- 1.600 m²
Status: Completed in 2022

Interior design: A2D architecture 2 design
M&E engineer: VHC (HVAC) & VMA (electro)
Photography: Alex Verhalle

In this project, we wanted to make sure that the renovation and refurbishment of three floors of an existing office building was as flexible, sustainable, and comfortable as possible. Open space workplaces and closed meeting rooms alternate. Concentration areas and direction offices provide comfort and flexibility. We use acoustic plaster on the structural ceiling and leave technics visible to maintain maximum ceiling height and as such enhance spaciousness.

Address: Dilbeek
Client: Brink's Solutions Belgium
Programme: Interior renovation and refurbishment of the ground floor, 1st and 2nd floor of an existing office building.
Area: +/- 1.600 m²
Status: Completed in 2022

Interior design: A2D architecture 2 design
M&E engineer: VHC (HVAC) & VMA (electro)
Photography: Alex Verhalle